INTRODUCTION

Supporting Critical Mining Operations in Western Australia

Genesis Minerals faced a significant challenge in dewatering Tower Hill Pit to safely commence mining operations, requiring a high-capacity pump system capable of delivering 80L/s while integrating with SCADA telemetry and incorporating robust leak detection mechanisms. Through a collaborative partnership with Greenlands Equipment, Coerco provided precision-engineered solutions, including the PNT-P-600 Bore Pump Pontoon and specialised pipe floats that ensured reliable performance in the harsh mining environment. This turnkey dewatering project demonstrates how strategic partnerships and advanced engineering can deliver critical infrastructure solutions that meet the demanding requirements of modern mining operations.

Agricultural field at sunset

THE CHALLENGE

Dewatering Tower Hill Pit

Genesis Minerals faced the critical challenge of dewatering Tower Hill Pit in Western Australia to safely commence mining operations. This required a high-capacity pump system capable of delivering water at 80L/s while integrating seamlessly with the site’s SCADA telemetry system and incorporating a robust leak detection mechanism to ensure operational safety.
impact

High-Capacity System Requirements

The project demanded a specialized pump system capable of delivering 80L/s while integrating seamlessly with existing SCADA telemetry and leak detection systems.

Harsh Mining Environment

The challenging conditions of the Western Australian mining site required corrosion-resistant materials and robust construction to ensure long-term operational reliability.

Complex Integration Demands

The dewatering system needed precise coordination between multiple components including pontoons, pipe floats, and pipework to function as a cohesive turnkey solution.

THE SOLUTION

Coerco’s Key Contributions

image of Coerco’s Key Contributions
Precision Engineering

Precision Engineering

The PNT-P-600 Bore Pump Pontoon provided a stable, corrosion-resistant foundation specifically designed to support high-capacity pump systems in harsh mining environments while ensuring seamless SCADA integration.

Reliable Water Transport

Reliable Water Transport

MTF130 & MTF75 Pipe Floats delivered superior buoyancy and impact resistance, maintaining stable water flow throughout the 80L/s dewatering operation while protecting critical HDPE pipework infrastructure.

Collaborative Integration

Collaborative Integration

Strategic partnership with Greenlands Equipment enabled coordinated delivery and installation of all components, ensuring the complete turnkey solution met project timelines and operational safety standards.

THE IMPACT

A Tailored Solution for Tower Hill Pit

80L/s

DEWATERING CAPACITY

High-performance pump system delivered the required flow rate to safely commence mining operations while maintaining operational efficiency.

100%

SCADA INTEGRATION

Seamless integration with existing telemetry systems enabled real-time monitoring and control of the dewatering infrastructure.

Zero

Operational Delays

Collaborative partnership and precision engineering ensured project completion on schedule without compromising safety or performance standards.

WHY CHOOSE US

Whatever it Takes - What Sets Coerco Apart

Community Focus
Community Focus

Community Focus

As a family-owned business, we're passionate about improving lives, supporting charitable causes, and actively participating in community events while creating local jobs.

Customer First
Customer First

Customer First

We provide exceptional customer care with prompt, efficient, tailored solutions, actively listening to your feedback and offering genuine support from first contact through post-delivery.

Superior Engineering
Superior Engineering

Superior Engineering

Our 30+ years of in-house engineering expertise and 150+ skilled team deliver innovative solutions using the widest product range and strategic industry partnerships.

30+

Years In Business

150+

Team Members

82,000+

Square Metres of Manufacturing

Can We Help?