Introduction
When ExxonMobil’s massive PNG LNG project needed reliable water and wastewater treatment infrastructure, Coerco partnered with MAK Water to supply custom-engineered poly tanks designed for performance, durability, and remote installation.
The Challenge
Infrastructure Had to Be Preassembled and Easy to Reinstall All tanks had to be manufactured to allow prefabrication of interconnecting pipes and cables, simplifying on-site assembly in a distant, hard-to-access location.
20-Year Mechanical and Electrical Lifespan Was Mandatory The treatment plant components needed to meet strict longevity standards to ensure sustained performance under tough conditions.
Project Success Depended on Trusted Partnerships Given the scale and sensitivity of the project, the client required suppliers with a strong track record of quality and dependability no room for failure.
The Solution
Built to Spec, Ready for On-Site Integration Coerco tanks were customized to support preassembled piping and cabling—saving time and ensuring smooth installation on-site.
20-Year Design Life Achieved with Premium Polyethylene All tanks were built using high-grade materials, giving them resilience far beyond that of cheaper alternatives.
Decades of Collaboration Pay Off MAK Water confidently chose Coerco based on a long-standing relationship and proven success across multiple projects.
WHY CHOOSE US
As a family-owned business, we're passionate about improving lives, supporting charitable causes, and actively participating in community events while creating local jobs.
We provide exceptional customer care with prompt, efficient, tailored solutions, actively listening to your feedback and offering genuine support from first contact through post-delivery.
Our 30+ years of in-house engineering expertise and 150+ skilled team deliver innovative solutions using the widest product range and strategic industry partnerships.
Years In Business
Team Members
Square Metres of Manufacturing