Introduction
Delivering infrastructure to Western Australia's remote mine sites is no easy task. But with innovative design and collaboration, ATCO and Coerco overcame complex logistical and technical challenges to provide reliable ablution systems to key mining projects.
The Challenge
Misaligned Inlet Placement Threatened Functionality ATCO's ablution blocks featured a structural beam across the waste inlet area, making it difficult to connect to standard Coerco tanks.
Flooding at Iron Bridge Delayed Operations Severe weather caused flooding that damaged and displaced ATCO's ablution units, risking project delays.
Unusual Leaks at WTS2 Mine Site Extreme environmental wear led to a leak in one of the waste tanks, highlighting the need for rapid maintenance and resilience.
The Solution
Smart Engineering Solves Inlet Blockage Coerco’s team designed and installed a riser frame to bypass the obstruction, allowing seamless integration with ATCO’s systems.
Rapid Response After Flooding After the flood, Coerco quickly retrieved, assessed, and tested the tanks—replacing key components to get them back in action.
Leak Repaired with Minimal Downtime When an unexpected leak surfaced at WTS2, Coerco swiftly performed on-site repairs, preventing disruption to operations.
WHY CHOOSE US
As a family-owned business, we're passionate about improving lives, supporting charitable causes, and actively participating in community events while creating local jobs.
We provide exceptional customer care with prompt, efficient, tailored solutions, actively listening to your feedback and offering genuine support from first contact through post-delivery.
Our 30+ years of in-house engineering expertise and 150+ skilled team deliver innovative solutions using the widest product range and strategic industry partnerships.
Years In Business
Team Members
Square Metres of Manufacturing