Genesis Minerals faced the critical challenge of dewatering Tower Hill Pit in Western Australia to safely commence mining operations. This required a high-capacity pump system capable of delivering water at 80L/s while integrating seamlessly with the site’s SCADA telemetry system and incorporating a robust leak detection mechanism to ensure operational safety.
Greenlands Equipment delivered the complete turnkey solution for this project, which included:
Coerco played a vital role in supporting Greenlands Equipment’s execution of the project by supplying precision-engineered products that met the project’s high-performance standards.
Coerco’s PNT-P-600 Bore Pump Pontoon provided the foundation for the dewatering pump system, delivering:
Learn more about Coerco Pontoons here
Coerco’s Pipe Floats were instrumental in protecting and supporting the HDPE pipework integral to the dewatering infrastructure:
Learn more about Coerco Hose and Cable Floats here
Coerco’s high-quality components ensured the dewatering system could withstand the operational demands and abrasive conditions of the site.
While Greenlands Equipment managed the project’s implementation, Coerco ensured seamless delivery of its products to their Perth facility:
At Coerco, we believe that great outcomes stem from collaboration and innovation. For the Tower Hill Pit dewatering project, we partnered with Greenlands Equipment to deliver tailored solutions that met the project’s complex demands. From our advanced PNT-P-600 Bore Pump Pontoon to our state-of-the-art pipe floats, every component was engineered with precision to perform in the toughest conditions.
This project is a testament to Coerco’s dynamic and reliable approach, backed by years of experience and a commitment to delivering exceptional results. By working closely with Greenlands Equipment, we helped ensure that this critical mining project was completed safely, efficiently, and on schedule.