Bucci Group Praises Coerco’s Flo-Vault® for Fast, Reliable Installation

Flo-Vault®

Bucci Group Praises Coerco’s Service & Flo-Vault® for Fast, Reliable Stormwater Installation

Bucci-Group_Case-Study_Summary

Download Case Study

The Challenge: A Reliable Stormwater Solution for a Large-Scale Project

Bucci Group, a leading civil construction company, needed a high-capacity stormwater system that could be installed quickly and efficiently while ensuring long-term reliability. With a 235m³ Flo-Vault® storage system and integration with eight soak wells, the project demanded a solution that was not only structurally sound but also time-efficient to install.

The Solution: Coerco’s Flo-Vault® – A Game-Changer for Rapid Installation

The Bucci Group team selected Coerco’s Flo-Vault® modular tank system for its lightweight, high-strength design and rapid installation process.

Watch Bucci Group’s Experience with Flo-Vault®:

 

Brad Hitch, Project Director at Bucci Group, praised the installation efficiency of Flo-Vault®, stating:
"The Flo-Vault® system clips together with ease, saving time on-site and requiring minimal manpower. It was a straightforward job—just two days for two people."

His team highlighted how the system’s palletised delivery and simple assembly helped streamline the process:
"For a big job like this, having Flo-Vault® arrive ready to assemble was a huge advantage. We simply unloaded, clipped the modules together, and backfilled—it was that quick!"

Why Bucci Group Chose Coerco

Beyond the product itself, Bucci Group valued Coerco’s exceptional service and technical support from start to finish.

“The reason we chose Coerco was the service we received from the very start. The drawings, the support, and even the on-site training made the whole process easy and professional.” 
— Brad Hitch, Project Director, Bucci Group 

 

See How Flo-Vault® Works:

 


 

“The Flo-Vault® system saves a lot of time on-site and requires minimal manpower. For a big project like this, it was a game-changer.” 
— Brad Hitch, Project Director, Bucci Group 

 

The Results: Speed, Reliability, and Future Projects

Rapid Installation – Flo-Vault®'s click-together system enabled fast assembly with minimal labour.
Professional Support – Coerco provided design guidance, documentation, and on-site training.
Future Collaboration – Bucci Group looks forward to integrating Flo-Vault® in upcoming projects.

 

“We’ll definitely be using Flo-Vault® again. It’s quick, easy to install, and extremely durable. Plus, the support from Coerco’s team was fantastic.”  

Bucci-Group_Case-Study_Images

Find Out More 

Looking to optimise stormwater management for your next project? Contact Coerco today to see how our engineered, certified solutions can make a difference. 